A 3 – storey apartment building was experiencing settlement on the entire foundation.  The condominium group needed to have the foundation stabilized.  We assessed the pattern of settlement and put together an Engineered Plan for Underpinning Remediation using Screw Pile technology.

PROJECT GOALS

  • Stabilize the foundation of the apartment building

OUR APPROACH

  • Soils bore holes were done, loads required were calculated then piles were designed
  • We excavated all of the foundation walls down to the footing

  • Our SVL90 Kubotta with 20,000 foot-lb specialized drive head installed screw piles in sections to the required depth of 28 feet.

  • Underpinning pile brackets were attached to the top of the piles

  • Lift assemblies were attached to the brackets then 20 Ton jacks installed and all screw piles were loaded

  • Site was backfilled and cleaned up

What our customers say:

Don and Eve Neil

It is terrific to see that your company’s motto of “Quality without Compromise” is more than just words… The job was completed ahead of schedule and the workers ensured that when they left, the yard looked just like it did when they arrive. Well, actually it looked better…Read more

Aileen & Wayne Dembicki

I would like to take this opportunity to thank you for a job well done. After this past weekend’s deluge, our basement was left completely dry.Read more

"COMMITTED TO A GREAT CLIENT EXPERIENCE SINCE 1989"