Royale – Foundation Underpinning

A 3 – storey apartment building was experiencing settlement on the entire foundation.  The condominium group needed to have the foundation stabilized.  We assessed the pattern of settlement and put together an Engineered Plan for Underpinning Remediation using Screw Pile technology.

PROJECT GOALS

  • Stabilize the foundation of the apartment building

OUR APPROACH

  • Soils bore holes were done, loads required were calculated then piles were designed
  • We excavated all of the foundation walls down to the footing

  • Our SVL90 Kubotta with 20,000 foot-lb specialized drive head installed screw piles in sections to the required depth of 28 feet.

  • Underpinning pile brackets were attached to the top of the piles

  • Lift assemblies were attached to the brackets then 20 Ton jacks installed and all screw piles were loaded

  • Site was backfilled and cleaned up

What our customers say:

Andrew Campbell

(After a record-breaking rainfall in July 2012 and days before we were leaving on vacation, we returned home and) found that our basement was flooded….

Read more

Bobbi Beeson

It’s no surprise that repairing a home’s foundation and all that comes with the project would be a stressful, messy and unpredicatable job. Kevin and …

Read more

"COMMITTED TO A GREAT CLIENT EXPERIENCE SINCE 1989"